settings_suggest Production Preparation

Production Preparation.
From BOM to Joint Registry.

Object structure, lines, spools, isometric drawings - set up once. Import BOM from Excel, create shop-fabricated spools, and get a joint registry ready for welding handover.

Project structure and spool tracking in WebJoint

The Cost of Chaos at Project Start

Preparation takes weeks, and mistakes at this stage drag through the entire project.

schedule

Manual Joint Registry Entry

On a large facility there are thousands of joints. Transferring from isometrics to Excel takes a week or more - before welding even starts.

bug_report

Errors in Joint Parameters

Wrong diameter, wrong steel grade, wrong joint type - every error surfaces at welding or NDT stage.

sync_problem

No Link Between Shop and Site

Spools are fabricated in the shop, then installed on-site. Without a unified registry no one knows what is done, in progress, or not started.

What the System Does at Preparation Stage

account_tree

Facility Structure

Set up the hierarchy once: facility → piping system → line → isometric. All joints and spools are linked to this structure - search and filtering work instantly.

Objects Piping Systems Lines Isometrics
upload_file

BOM and Joint Import from Excel

Export your specification from CAD software to Excel and upload to the system. BOM positions (pipes, elbows, flanges) and joint registry are imported in one file.

Excel (.xlsx) BOM Joint Registry
settings

Shop Spool Tracking

A spool (assembly unit) is fabricated in the shop and installed on-site. The system tracks the status of each spool: in progress, ready, installed - with all joints linked inside.

Shop Joints Field Joints Spool Status
library_books

Project Reference Data

Piping classes, welding materials, WPS, NDT norms by category - set once per project and used everywhere. Can be copied from a previous project.

Piping Classes WPS Welding Materials NDT Categories

What Project Start Looks Like

From project creation to a ready joint registry - a few sequential steps.

01
add_circle

Create Project

Name, customer, contractor, dates. Team gets access with the right roles.

02
account_tree

Set Up Structure

Objects, piping systems, lines. The hierarchy where all joints will sit.

03
upload_file

Import BOM

Upload the joint registry and BOM from Excel. The system parses parameters and creates records.

04
check_circle

Hand Over to Production

Registry is ready. Welders, lab, and PTO work with unified data.

Shop Spools and Field Joints - in One Registry

A pipeline consists of shop spools (fabricated in the shop) and field joints (welded on-site). The system distinguishes them and tracks each.

factory
Shop Spool

Assembly unit fabricated in the shop. Contains several shop joints. Status: in progress / ready / shipped / installed.

construction
Field Joint

Joint welded directly on-site during pipeline assembly. Not linked to a spool.

timeline
Real-Time Progress

Line completion percentage is calculated automatically from welded joints - both shop and field.

Spool Registry — Line L-42
8 of 12 ready
Line completion 67%
Spool DN Joints Type Status
Л-42-У01 150 4 Shop Ready
Л-42-У02 150 3 Shop Ready
Л-42-У03 100 5 Shop In Progress
Л-42-М01 150 1 Field Ready
Л-42-М02 150 1 Field Not Started
Л-42-У04 80 6 Shop Not Started

Without System vs. With WebJoint

close

Without System

  • remove Manual joint transfer from isometrics to Excel - from one week
  • remove Parameter errors that surface during welding
  • remove Separate spreadsheets for welding, PTO, and lab
  • remove No visibility into shop spool completion
  • remove Drawing revision means rebuilding the entire registry manually
check

WebJoint

  • check Joint registry import from Excel in minutes
  • check Parameters saved from source without manual entry
  • check One registry - everyone sees the same data
  • check Status of every spool and joint in real time
  • check On update - change one import file

See What Project Start Looks Like