Digital Welding Tracking & Pipeline Acceptance for Hazardous Facilities

A unified platform connecting the contractor, construction supervision, and NDT laboratory.

One data entry - automatic executive documentation per GOST and SP. Replacing Excel files and paper logs at industrial facilities.

check_circle СП 70.13330
check_circle ГОСТ 7512 / 14782
WebJoint - project dashboard for ELOU-AVT-6 reconstruction
trending_up
Executive documentation delivery faster
3x faster
5+
Industrial Facilities
12 000+
Joints in the System
3x
Faster Documentation Delivery
-40%
Documentation Time
Trusted By
apartment
PromFinStroy
General contractor at oil refinery facilities
Lukoil Afipsky Refinery
«WebJoint allowed us to completely eliminate paper logs on site. Executive documentation preparation time was reduced dramatically, and the client's construction supervision gained transparent real-time access to welding status.»
Video Demo
WebJoint video demo preview
play_arrow
See how WebJoint works
3 minutes
warning Sound Familiar?

Why Projects Stall at the Handover Stage

On a typical refinery project with 10,000+ joints, these problems cost millions and months of delays.

description

Documentation Takes Months

Manual log filling, transferring data from notebooks to Excel, endless signature collection. On a large site, a PTO engineer spends 60-70% of working time on paperwork.

trending_up Losses: 2-4 months on facility handover
visibility_off

Management Can't See the Real Picture

How many joints are welded? What is the defect rate? Where are the bottlenecks? Answers arrive a week late or not at all. Decisions are made «blindly».

trending_up Risk: planning errors and budget overruns
sync_problem

Chaos Among Stakeholders

Welding data is with the contractor. NDT results are in the lab. Construction supervision remarks are in a separate log. Information gets lost, duplicated, and contradicts itself.

trending_up Losses: up to 20% of budget on rework

Excel + Paper vs WebJoint

Compare how welding tracking works now and how it could work.

close Now (Excel + Paper)
  • remove Joint data spread across 12+ Excel files on different computers
  • remove Welding log filled manually, 3-5 days to compile a documentation package
  • remove NDT results delivered on paper with a 2-5 day delay
  • remove Construction supervision has no real-time data access
  • remove Data transfer errors, inconsistencies between documents
check_circle With WebJoint
  • check Unified cloud-based joint registry with full change history
  • check Documentation generated automatically with one click - in minutes
  • check NDT protocols created in the system, instantly available to all participants
  • check Real-time dashboard for the general contractor and client
  • check One data entry - all documents generated automatically

How It Works

From the first joint to a complete documentation package - three simple steps.

1

Upload Your Project

Import pipeline specifications, ISO drawings, and project data. The system creates the structure: facility → lines → nodes → joints.

2

Work in a Unified Environment

Foremen record welding, the lab performs NDT, construction supervision accepts - all in one system. Data is entered once.

3

Get Ready Documentation

Welding logs, VT reports, NDT protocols, summary sheets - generated automatically as PDF per GOST and SP.

What You Get

An end-to-end digital flow from isometric drawings to documentation delivery.

Isometric Parsing

Upload an Isometric - the System Extracts Data Automatically

The main problem with digital welding tracking systems is the lack of data. Manually entering thousands of joints, diameters, steel grades, and pipeline categories takes weeks. WebJoint solves this: upload an ISO drawing, and the parser automatically extracts all information - lines, joints, materials, diameters, wall thicknesses. The project is ready to go in minutes, not weeks.

  • upload_file Upload ISO drawings in PDF and DWG formats
  • auto_fix_high Automatic extraction of joints, lines, diameters, and materials
  • rocket_launch Project setup in minutes instead of weeks of manual entry
  • edit_note Review and adjust recognized data before confirmation
WebJoint - automatic isometric drawing parsing
WebJoint - weld joint registry
Joint Registry

A Complete Digital Twin of Every Weld Joint

Unique joint ID, linked to ISO drawings, geometry, steel grades, welders, welding method. Full history: fit-up → welding → VT → NDT → acceptance → documentation closure.

  • fingerprint Automatic generation of unique joint IDs
  • filter_list Filters by lines, statuses, diameters, welders
  • download Export to Excel and specification import
Quality Control

Eliminate Missed Defective Joints

VT, RT, UT, PT - complete quality management cycle. Electronic protocols, automatic joint sampling for NDT, and GOST-based defect classification.

  • analytics Smart sampling: inspection % by pipeline category
  • note_add Digital protocols per GOST 7512, 14782
  • query_stats Defect statistics by welders and sections
WebJoint - NDT and VT quality control
WebJoint - executive documentation generator
Documentation Generator

Cut Documentation Preparation Time by 3x

Forget manual log filling. One data entry - a complete documentation package is generated automatically per SP 70.13330, VSN 012-88, and client requirements.

  • description Welding log per SP 70.13330 form
  • table_chart Summary sheets, NDT protocol registries
  • picture_as_pdf One-click PDF export
check_circle СП 70.13330 check_circle ВСН 012-88
Economic Impact

Measurable Results from the First Quarter

The platform pays for itself within the first months of implementation through reduced labor costs and fewer rework cycles.

-40%
Documentation Preparation Time
Auto-generation instead of manual log and report filling
-20%
Rework Costs
Early defect detection prevents costly re-welding
100%
Data Transparency
Real-time dashboards and full audit trail
3x
Faster Facility Handover
Reduced timelines through parallel work of all participants

Implementation Experience

Real results at industrial facilities.

oil_barrel
Afipsky Refinery
ELOU-AVT-6 unit reconstruction
Oil Refining Hazard Class I
11 000+
Weld Joints
86
Welders on Site
4 200+
RT Inspections Performed
3 500+
Documents Generated

Challenge

Implement digital welding tracking at the ELOU-AVT-6 reconstruction site with transparent quality control for the client and automatic executive documentation generation per SP 70.13330.

Result

  • check_circle Complete transition from paper-based tracking to a digital platform in 2 weeks
  • check_circle Automatic generation of welding logs, summary sheets, and registries in PDF
  • check_circle Quality funnel with control at every stage: welding → VT → NDT → acceptance
  • check_circle Client's construction supervision gained online access to project data

Security & Standards Compliance

The platform is designed to handle data from high-responsibility industrial facilities.

gavel

GOST & SP

Documentation is generated in compliance with SP 70.13330, GOST 7512, GOST 14782, VSN 012-88.

lock

Data Protection

Data encryption, immutable audit log, role-based access, backups.

history

Audit Trail

Complete history of all actions: who changed what and when. Records cannot be forged or deleted.

cloud_done

Flexible Deployment

Cloud version (SaaS) or on-premise deployment on the client's closed network.

Frequently Asked Questions

How long does implementation take? expand_more
A typical implementation takes 1-2 weeks. This includes uploading the project structure, setting up roles, and user training. At the PromFinStroy site, full operation began 10 days after launch.
Can it work without internet? expand_more
Yes, the mobile app works in offline mode. Data syncs automatically when a connection is available. This is critical for remote sites without stable internet.
Can it be deployed on-premise? expand_more
Yes, WebJoint supports deployment on the client's servers. This is in demand at facilities with information security requirements and closed networks.
Which regulatory documents are supported? expand_more
SP 70.13330.2012, VSN 012-88, GOST 7512, GOST 14782, GOST 18442. Documentation templates are customized to meet specific client requirements.
How does the demo work? expand_more
We conduct the demo using your actual project data. We upload your specifications and show how the system works with your specific pipelines and joints. The demo takes 30-40 minutes.

Request a Demo Using Your Project Data

We'll show you how WebJoint works with your pipelines - we'll upload your ISO drawings and demonstrate automatic documentation generation in 30 minutes.

  • check_circle Personal demonstration, 30-40 minutes
  • check_circle Using your facility's actual data
  • check_circle ROI assessment for your project
verified GOST & SP Compliant

rocket_launch Request Demo Access

person
call
domain

By clicking the button, you agree to our privacy policy.